Modelling and Simulation of SCADA and PLC System for Power System Protection Laboratory
DOI:
https://doi.org/10.2478/ecce-2021-0003Keywords:
Automatic control, Electrical safety, Frequency control, Power system protection, Programmable logic devices, SCADA systems, Supervisory control, Voltage controlAbstract
The protection of power system is an essential trait in a huge network to efficiently detect and isolate the sections undergoing faults or abnormal behaviour. The key components of a protection scheme include circuit breakers, relays, switchgears and fuses which employ communication from one station to another to achieve high-speed tripping. The automation of these components at the laboratory level using programmable logic controller (PLC) along with supervisory control and data acquisition (SCADA) system owns paramount importance for intelligent decision making, sensing, actuating, monitoring and maintaining the record in the host server. This paper discusses such a technique for conventional power system protection laboratory at a new level of development to promote a control system through PLC and SCADA. The control system has indication of over and under values of voltage, load and frequency, which can trigger malfunctioning of equipment and must be rectified. Furthermore, ground fault and inverse current indication are added to the system for monitoring and controlling purposes. The proposed system enhances the efficiency and safety of the expensive equipment and the personnel to the next level and also introduces new standards of automated protection schemes for modern technical institutes.References
K. I. Wong and T. U. Siaw, “PLC and SCADA Laboratory Experiments for a Final Year Instrumentation Course,” Int. J. Inf. Educ. Technol., vol. 5, no. 11, pp. 865–868, 2015. https://doi.org/10.7763/IJIET.2015.V5.628
E. R. Alphonsus and M. O. Abdullah, “A review on the applications of programmable logic controllers (PLCs),” Renew. Sustain. Energy Rev., vol. 60, pp. 1185–1205, 2016. https://doi.org/10.1016/j.rser.2016.01.025
X. Yu and C. Singh, “A practical approach for integrated power system vulnerability analysis with protection failures,” IEEE Trans. Power Syst., vol. 19, no. 4, pp. 1811–1820, 2004. https://doi.org/10.1109/TPWRS.2004.835656
C. P. Janssen, S. F. Donker, D. P. Brumby, and A. L. Kun, “History and future of human-automation interaction,” Int. J. Hum. Comput. Stud., vol. 131, pp. 99–107, 2019. https://doi.org/10.1016/j.ijhcs.2019.05.006
IEEE Standard for SCADA and Automation Systems, IEEE Std C37.1-2007, vol. 23, no. 6, 2007.
C. Lin, X. Min, and J. Junru, “Exploration on Educational Reform of Electrical Engineering and Automation Professional,” 2019 Asia-Pacific Conference on Advance in Education, Learning and Teaching (ACAELT 2019), pp. 1321–1325, 2019.
B. Ram and D. N. Vishwakarma, Power System Protection and Switchgear. McGraw-Hill Professional Publishing, 2011.
M. Eremia and M. Shahidehpour, Handbook of Electrical Power System Dynamics: Modeling, Stability, and Control. The Institute of Electrical and Electronics Engineers, Inc., 2013. https://doi.org/10.1002/9781118516072
M. S. Thomas, P. Kumar, and V. K. Chandna, “Design, development, and commissioning of a supervisory control and data acquisition (SCADA) laboratory for research and training,” IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1582–1588, 2004. https://doi.org/10.1109/TPWRS.2004.826770
J. F. M. valter Pinto, Silviano Rafeal, “PLC controlled industrial processes on-line simulator,” IEEE Int. Symp. Ind. Electrnics, 4–7 June, 2007. https://doi.org/10.1109/ISIE.2007.4375084
D. Li, Y. Serizawa, and M. Kiuchi, “Concept design for a Web-based Supervisory Control and Data-Acquisition (SCADA) system,” Proc. IEEE Power Eng. Soc. Transm. Distrib. Conf., vol. 1, ASIA PACIFIC, pp. 32–36, 2002.
R. Bayindir and Y. Cetinceviz, “A water pumping control system with a programmable logic controller (PLC) and industrial wireless modules for industrial plants-An experimental setup,” ISA Trans., vol. 50, no. 2, pp. 321–328, 2011. https://doi.org/10.1016/j.isatra.2010.10.006
J. L. Vazquez-Gonzalez, J. Barrios-Aviles, A. Rosado-Muñoz, and R. Alejos-Palomares, “An industrial automation course: Common infrastructure for physical, virtual and remote laboratories for PLC programming,” Int. J. Online Biomed. Eng., vol. 14, no. 8, pp. 4–19, 2018. https://doi.org/10.3991/ijoe.v14i08.8758
D. Cousineau, D. Mentré, and H. Inoue, “Automated deductive verification for ladder programming,” Proceedings F-IDE 2019, EPTCS, vol. 310, pp. 7–12, 2019. https://doi.org/10.4204/EPTCS.310.2
H. A. Abbas, “Future SCADA challenges and the promising solution: The agent-based SCADA,” Int. J. Crit. Infrastructures, vol. 10, no. 3/4, pp. 307–333, 2014. https://doi.org/10.1504/IJCIS.2014.066354
R. K. Chauhan, M. L. Dewal, and K. Saini, “Utility of SCADA in power generation and distribution system,” Proc. 2010 3rd IEEE Int. Conf. Comput. Sci. Inf. Technol. ICCSIT 2010, vol. 6, pp. 648–652, 2010.
T. Adams, “SCADA System Fundamentals,” Course No: E01-007, pp. 3–5, 2014.
R. Slusariuc, L. Samoila, G. Popescu and A. D. Handra, “SCADA Systems Analysis For Industrial Procesess,” Annals of the University of Petrosani, Electrical Engineering, vol. 21, pp. 17–22, 2019.
H. Salih, H. Abdelwahab, and A. Abdallah, “Automation design for a syrup production line using Siemens PLC S7-1200 and TIA Portal software,” Proc. 2017 Int. Conf. Commun. Control. Comput. Electron. Eng. ICCCCEE 2017, pp. 5–9, 2017. https://doi.org/10.1109/ICCCCEE.2017.7866702
S. L. Jämsä-Jounela, “Future trends in process automation,” IFAC Proc. Vol., vol. 40, no. 1, pp. 1–10, 2007. https://doi.org/10.3182/20070213-3-CU-2913.00003
S. SIMATIC, “S7-1200 Easy Book,” pp. 1–454, 2015.
L. Prenzel and J. Provost, “PLC Implementation of Symbolic, Modular Supervisory Controllers,” IFAC-PapersOnLine, vol. 51, no. 7, pp. 304–309, 2018. https://doi.org/10.1016/j.ifacol.2018.06.317
Downloads
Published
Issue
Section
License
Copyright (c) 2021 Ayesha Faryal et al., published by Sciendo
This work is licensed under a Creative Commons Attribution 4.0 International License.